Browse archive:

default    GAMBOL - Stanley 36     Gregory - Stanley 36    MORGAN Vintage Bunker & Ellis Gets A New Teak Deck    Stanley 38 - MAISIE McGOO    Williams 28 Bass Boat   


Back to Site

Oiled PilothouseOiled Aft CockpitOiled Engine HatchesHatches Looking AftEngine HatchesCutting In HatchesStarboard QuarterStarboard Side DoneLooking AftHalfway DoneFir Decking Going DownFir Decking Being LaidStatic Testing TanksNew Fuel TanksSound InsulationPainted BilgePrepping Sound InsulationTreated FramingStripping Rub & ToerailsStripping Cabinside VarnishNew FramingDeck Raised 2"Exposed Framing, Tanks & ExhaustBare FramingDeck RemovalDeck Removal Hatches RemovedPrepping For Deck RemovalStarboard Inside ViewWindow Frames With GlassFrame From The InsideNew Window FramePortside PatternForedeck PatternBow SeatDetail Around CoamingPattern For Teak DeckForedeckStbd. SidePatterning For Teak DecksPortside SubdeckInstalling SubdeckInstalling SubdeckEpoxy Sealing SubdeckPlywood SubdeckPlywood SubdeckCutting Away Remaining DeckNew Stern Deck BeamNew Short BeamsNew Short Beam & Tie RodPlugging The HolesMore Damaged BeamsAft Beam RemovedShort Beams RemovedDamaged Deck BeamRemoving DeckingOriginal Toe Rails "Popped" OffFrame HeadsStart Of Deck RemovalSigns Of Moisture Under DeckAft Deck - Before RemovalBow - Deck Before RemovalWashboardWashboardCowl Vent ShadowsBow SeatPort Quarter ViewShowing the ColorsMaisie and McGoo Enjoying the RideSetting a Fine ProfileOff She GoesMartha Says, All Right!In She Goes!Martha Christens the BoatOwner Dana Robes and Builder John Williams Congratulate EachotherThe Proud OwnersThe Expectant Crowd and PressChampagne at the ReadyOff to the Launch SlipMaisie and McGoo Looking AnxiousCannon Ready for Launch SalutePrepping the RigMast Folded DownHanging Locker and SetteeStarboard Side SetteeCockpitCenterline BerthDishrack with DoorsMast Stepped, Bottom PaintedComing Out for LaunchGalley FaucetOverhead Wire ChaseVarnished SeatEngine HatchHatches OnSearchlight and HornsStorage LockerHeadButterfly Hatch from InsideMicrowave CabinetHelm SeatCockpit SeatBridge Deck with Nav LockerPainted Radar MastBack to Production ShopPaintedPrimedPreped for PrimerButterfly HatchMast and Boom HardwareOff to PaintOn Her Lines and Engines RunningReady for Initial LaunchHead GratesDecks and Cabintops PrimedPilot House Windshield, Wire Chase and WainscottingStarboard Helm Furniture in Pilot HousePortside Settee in PlaceGalley GraniteSink DetailBackside of Electric PanelPortside Settee ClosedPortside Settee - OpenElectric Panel InstalledPilothouse Furniture - Starboard SideGluing Up LedgersPorts OutsidePorts InsideRadar MastBlended WeldsInstalling Windshield and Instrument PanelWindows in WindshieldTaking a BreakTeak Deck Stage IVHead Door TrimBagging Aft Bulkhead PanelsConsole LayoutTeak Deck Stage IIIBronze Port LightCockpit Teak Stage IIGlueing Up Small Door JambsShower Door TrimInstalling Cockpit Teak, Stage IBrazilian Cherry SoleForecastle SolePilot House WindshieldStern WinchBow RailPilot house mahogany 2Windlass, cleats, chocks and bow rollerMast and boom partsInterior lockersHead cornerpost glue upHall Quarry granite head counter topGoose neckGluing up pilot house mahoganyCenterline bunk framingCap rail glue upCap rail detailBronze inlay with John Williams Boat Company logoBow thrusterAir box and pilot house mahoganyAft Bulkhead SliderTeak Cheek Blocks & Skenes ChocksPatterning For Granite CounterSliding Door HardwareTeak Deck HatchesElectrician Is Here!  Cap RailInterior Mahogany StartedCabinet Mock-UpPilothouse Side Windows InstalledBronze Electric PanelAnchor RollerForedeck CleatPilothouse Wainscoting Head Platform & Electrics ChaseBare Teak CoverboardCabintop Hatch LayoutCabinside Cutout With Teak OverlayWainscoting In The HeadWhere Is The Electrician?Cedar In Hanging Locker & Varnished Cabin LinerSitka Ceiling In Bunk AreaPilothouse Overhead Wire ChasePilothouse Side Windows Dry FitAnchor Roller In ProductionHead Shower SeatBare Teak Cover BoardsFabricating Bronze Anchor RollerBowsprit With WindlassShower SeatHead Liner & WiringAft BulkheadFitting The BowspritPortlight LayoutTemporary Screws & No Breaks!  Bending On RailSteaming RubrailsGluing Eyebrow Above WindshieldPilothouse Settee Mock-UpPilothouse Mock-UpPattern For Teak DeckingEyebrow Glue-UpGalley Mock-UpGalley LayoutProp OnVacuum Clamps For EyebrowGalley Bulkhead & Kickboard DetailHead Vanity BulkheadWindshield TeakEyebrow DetailEyebrow FittingBack On Her LinesInside PilothouseSetting On Blocks On HullSliding It OverMating Top To HullPrepping For MoveJock Mocking Up The GalleyHead & Settee BulkheadsForecastle BulkheadsStarboard Side BagCockpit PlatformCockpit HatchShaped & SealedBag Removed - Cleaning Up!Listening For LeaksVacuum Bag On Port Side TeakVacuum Bag - Port SidePutting Vacuum Bag on Cabin Trunk TeakBulkhead StartedFitting CabinsidesPatterning BulkheadsTeak Transom And Trim TabsSeat Back In ProcessForepeak - Preparing Inside Of Hull For Ceiling InstallationMolded Cabintop - Making Patterns For Teak CabinsidesFinal PlankTeak Transom - Glued, No Bungs!  Gluing Up TransomMilling Trim Moving Hull To Wood ShopExhaust OutletCockpit Platform Dry FitProp Inspection TubeNida Core As Insulation Vacuum Bagged On HullShaft Log InstallationFloor FramingStarting the Platform FramingShaft LogBoom Glued UpSitka Spruce MastEngine Beds & Floor TimbersWindow Mock-UpThruster Tube InsideMock Up Window PlacementCummins QSC 8.3 EngineCabin Trunk ExtensionPilothouse Extension Close UpPilothouse Extension OverviewTop In Place For First TimeDry Fit Top On HullStanley 38 Top - Getting Ready For First Fitting On HullCut Out For Bow ThrusterBare Hull With Main BulkheadStanley 38 Hull - Transom Cut Out (Will Be Teak)TRUMPA Launch June 23, 2008 Photo Copyright Alison LangleyTRUMPA Launch June 23, 2008 Photo Copyright Alison LangleyTRUMPA Launch June 23, 2008 Photo Copyright Alison LangleyTRUMPA Launch June 23, 2008 Photo Copyright Alison LangleyTRUMPA Launch June 23, 2008 Photo Copyright Alison Langley TRUMPATRUMPATransom & Swim PlatformAfloat And MovingHitting The WaterLowering Into The WaterInto The SoundChristeningJock Gives The BlessingReady In The SlipComing Around To The SlipShiny!Final PrepWaiting For The TideWith WindshieldFrom AsternFresh Awlgrip Paint JobReady For The Paint BayComing Out Of The Fiberglass ShopFacing AftLooking ForwardWindhshield & CoamingBuilder RalphStarboard ProfileFrom the CockpitFitting The WindshieldBreast HookRubrails Steamed OnDeck & Platform Primed, Rubrails & Ceiling InstalledForward Windhsield Glue-UpWindshield Glue-UpWindshield LayoutBronze VentsWindshield Construction Windshield Construction Platform DownForecastleWindshield Mock-UpSystems InstallationForedeck Panel ConstructionDeck ConstructionWindshield Mock-UpSteering SystemGel Coat in BilgeFore DeckFramingExhaustPlatform FramingStuffing Box and Wet WellThe Power HouseLeaving the MoldStinger LayoutSkun OutGel CoatPrepping the MoldName & Hail on TransomWaiting for Finishing TouchesWaiting for Finishing TouchesWaiting for Finishing TouchesBoat MoveBoat MoveAwlgrip Photo #3Awlgrip Photo #2Awlgrip Photo #1First Sea TrialFirst Sea TrialTop being fitted to hullTop being positioned on hull 2Top being positioned on hull 1Molded Superstructure 2Molded Superstructure 1Superstructure (upside down)Pilot house sole looking forward companionway doorGalley (aft) and cedar lined locker (fwd) - both port sideSettee with drawers and door to head (starboard)Galley (facing aft)Overview of headEntry to head (starboard)BUILDING THE FORECASTLESTARBOARD FORECASTLEFORECASTLE - PORT SETTEEPORT FORECASTLEGLASSING RIBSENGINEWATER SYSTEMPROPELLER INSPECTION PORTFUEL TANKS